Pandasolar GM4 Mg-Al-Zn High Strength Plating Solar Panel Ground Mounting System Structure Exm Manufacturer

Still deciding? Get samples of $ !
Order Sample

Product Description

📋
Basic Specifications
Model NO.PD-GM-04
CertificationCE
ApplicationCommercial / Residential
MaterialSteel / Magnesium Aluminum Zinc
TypeGround Bracket System
Wind Speed ResistanceUp to 60m/s
Snow Load Capacity1.4kn/m²
Lead Time7-15 Days
Surface TreatmentMagnesium Aluminum Zinc (High Corrosion Resistance)
Standard ComplianceAS/NZS1170, Jisc8955:2017, IBC 2009
☀️
Ground Mounting System Overview

The Magnesium Aluminum Zinc Ground Mounting System is meticulously engineered to withstand extreme weather conditions, including maximum wind speeds and heavy snow loads. Designed for efficiency, this solar ground mounting bracket reduces labor costs while ensuring structural integrity and a long service life. It supports various foundation types: direct soil insertion, ground screws, and cement piers.

The double-column structure allows for precise height adjustments, particularly when using ground screw posts, offering higher installation accuracy and superior strength for commercial-grade projects.

Key Features:
  • Simple yet robust double-column structure
  • High strength and high self-healing properties
  • Inexpensive and cost-effective design
  • Aesthetic and professional visual appearance
  • Highly pre-assembled for rapid onsite installation
🛠️
Step-by-Step Installation Diagram

1. Installing Ground Screws

The foundation step involves drilling specialized screws into the soil to anchor the structure securely. Depth is determined by soil type to support the total system weight.

Ground Screw Installation

2. Install Beam & Support Poles

Once the foundation is set, beams and diagonal support poles are connected using high-grade bolts and nuts to create a stable framework.

Beam Installation

3. Rail Mounting

Mounting rails are attached to the beams. It is critical to ensure rails are perfectly level to provide a flat surface for the solar panels.

Rail Mounting

4. Solar Panel Attachment

Finally, solar panels are fastened to the rails using specialized mounting hardware, completing the high-strength installation.

Solar Panel Attachment
🏭
Production & Workshop Capacity

Our facility features professional processing workshops for both Aluminum and Steel materials. With independent cutting, drilling, stamping, and forging capabilities, we maintain a monthly productivity of 40-50MW. The steel workshop specializes in Magnesium Aluminum Zinc (S350GD/S450GD) with 6 dedicated production lines.

Workshop View 1
Workshop View 2
Workshop View 3
📦
Packaging & Logistics
Packaging 1
Packaging 2
Packaging 3
📜
International Certifications
Certificate 1
Certificate 2
Certificate 3
Frequently Asked Questions
What is the standard delivery time for an order?
The typical lead time is approximately 7 to 15 days, depending on the project scale and customization requirements.
Can I request samples for testing before placing a bulk order?
Yes, we provide free samples for testing and evaluation to ensure the product meets your site requirements.
Is OEM or customized design service available?
Absolutely. We accept OEM services and can customize the mounting designs to fit specific solar panel specifications and site conditions.
What materials are used for the ground mounting system?
The primary structure is made of Steel with a Magnesium Aluminum Zinc coating (S350GD/S450GD), providing exceptional durability and high self-healing properties.
What is the warranty period for this mounting system?
We offer a 12-year warranty on our ground mounting systems, reflecting our confidence in the material quality and service life.
What extreme weather conditions can the system handle?
Our systems are designed to withstand wind speeds of up to 60m/s and snow loads of up to 1.4kn/m², complying with international building codes.

Related Products